VIDEO / POWERPOINT. Storm water improvements, Shoreline Protection, Topographic and Bathymetric Survey, Wave and Water Level Data Collection, Wave Driven Sediment Transport, and more.
Next Steps
• Wave and Water Level Data Collection (Redeployed 23rd October)
• Permitting (Ongoing, began in October)
• Final Engineering Design (Ongoing, 30% submittal 13th November)
• CEQA (18th November kick-off)
• Construction Documents out to Bid (late Summer 2020)
• Construction (planned Fall 2020)