Coastside Buzz

Explore the Coast - Coastside Calendar & Directory - Articles, Podcasts & Video

MENUMENU
  • Home
  • Content
    • Multi-Media
      • The Coastal Butterfly
      • Coastside Disaster Prep
      • Coastside History
      • Coastsider Musicians
      • Phog Foundation
      • Surf Sessions
      • Writers Corner
        • Boys of the 60s
        • Wrong Shirt - A Memoir Series
    • Podcasts
      • Bedtime Stories
      • CoasTalk
      • Eclectic Radio Show
      • Fun On The Coast
      • Gone Fishing
      • HMBHS Cougar Radio
      • Just Call Wick
      • KHMB
    • Own Voice
      • Coastside Beach Ambassadors
      • InPerspective
    • Public Agencies
      • Cabrillo Unified School District
      • City of HMB Planning Commission
      • Coastside County Water District (CCWD)
      • Coastside Fire Protection District
      • Granada Community Services District (GCSD)
      • Half Moon Bay City Council
      • MidCoast Community Council (MCC)
      • Montara Water and Sewer District (MWSD)
      • San Mateo County
      • San Mateo County Harbor District
      • Sewer Authority Mid-Coastside (SAM)
  • BUZZ Calendar
  • BUZZ Directory
    • View the Directory
    • How it Works - Join Today
  • About
    • Promotion
    • Buzz Productions : Photo-Essays, Podcasts, Audiobooks and Videos
    • Newsletter Archive
    • Founder Bio
  • Contact
You are here: Home / Podcasts / City HMB Highway 1 South Gateway Safety and Landscaping Project

City HMB Highway 1 South Gateway Safety and Landscaping Project

December 27, 2018 by Michelle

ARTICLE / PHOTOS. What do you think?  The Half Moon Bay Planning Commission will be reviewing the Coastal Development Permit-Architectural Review, for City-initiated landscape improvements near the intersection of Higgins Canyon Road, Main Street, and Cabrillo Highway South (within the public right of way).

The proposed landscaping improvements include: plantings of compatible plant species and trees, creation of minor contours, sidewalk improvements including pedestrian ramps, medians and refuge spaces, stormwater detention, and two new gateway signs.

Project Description: This project will provide operational and safety improvements to Highway 1 between Wavecrest Road and Seymour Street. It also includes construction of a signal at the Higgins Canyon Road, Main Street and Highway 1 intersection, and landscape improvements at the south gateway to Main Street.

Project Status: Design Phase

Funding Source(s): Measure A grant from San Mateo County Transportation Authority (SMCTA) and City General Fund

Latest Update: 10/19/2018 – Project construction anticipated to begin spring 2019.

Contact: Ray Razavi, Traffic Engineer, E-mail

From the City of HMB 2018 Capital Improvements Plan (CIP)

Related

Filed Under: Home Top List, Podcasts Tagged With: 2018, City Council, Coastside, Education, gateway, Half Moon Bay, HMB, planning, south gateway

About Michelle

Longtime Coastside resident Michelle Dragony holds a degree in journalism with an emphasis in photography and radio broadcasting. But radio has always had her heart.

Follow Us!

CoastsideBuzz Instagram Icon Link Coastsidebuzz Facebook Icon Link

SUBSCRIBE TO WEEKLY BUZZMAIL

Half Moon Bay Coastside Tours Logo thumbnail

Coastside Buzz

About
Contact

Work With Us

Promotion
Buzz Productions

CoastsideBuzz Newsletter

Join Us on Facebook

Join Us on Facebook

Search

© Copyright 2021 · CoastsideBuzz.com · Half Moon Bay, California · All Rights Reserved