Coastside Buzz

Explore the Coast - Coastside Calendar & Directory - Articles, Podcasts & Video

MENUMENU
  • Home
  • Content
    • Multi-Media
      • The Coastal Butterfly
      • Coastside Disaster Prep
      • Coastside History
      • Coastsider Musicians
      • Phog Foundation
      • Surf Sessions
      • Writers Corner
        • Boys of the 60s
        • Wrong Shirt - A Memoir Series
    • Podcasts
      • Bedtime Stories
      • CoasTalk
      • Eclectic Radio Show
      • Fun On The Coast
      • Gone Fishing
      • HMBHS Cougar Radio
      • Just Call Wick
      • KHMB
    • Own Voice
      • Coastside Beach Ambassadors
      • InPerspective
    • Public Agencies
      • Cabrillo Unified School District
      • City of HMB Planning Commission
      • Coastside County Water District (CCWD)
      • Coastside Fire Protection District
      • Granada Community Services District (GCSD)
      • Half Moon Bay City Council
      • MidCoast Community Council (MCC)
      • Montara Water and Sewer District (MWSD)
      • San Mateo County
      • San Mateo County Harbor District
      • Sewer Authority Mid-Coastside (SAM)
  • BUZZ Calendar
  • BUZZ Directory
    • View the Directory
    • How it Works - Join Today
  • About
    • Promotion
    • Buzz Productions : Photo-Essays, Podcasts, Audiobooks and Videos
    • Newsletter Archive
    • Founder Bio
  • Contact
  • Elections 2022
You are here: Home / Public Agencies / Half Moon Bay City Council / Coronado to Mirada Section of Midcoast Multi-Modal Trail Waiting for 80′ Steel Bridge Early 2023

Coronado to Mirada Section of Midcoast Multi-Modal Trail Waiting for 80′ Steel Bridge Early 2023

October 4, 2022 by Michelle Leave a Comment

PRESS RELEASE. From San Mateo County Facebook September 30th, 2022.

Construction of the Midcoast Multi-Modal Trail is well underway with the majority of the project slated for completion December 2022!
The project includes installation of a weather resistant steel pedestrian bridge expected to arrive in February 2023. The bridge will span approximately 80 feet across Medio Creek (opposite the other more western Medio bridge’s detour).
Main activities currently underway include constructing the bridge foundation, vehicular barriers and ADA ramps along the trail alignment until the path is eventually sealed with new asphalt.
Once complete, the trail will connect El Granada to the south end of Miramar along Highway 1 to the Naomi Patridge Trail in Half Moon Bay. (See “Last Link” post)

San Mateo County Midcoast Multimodal Trail Project

About the Project

The Midcoast Multi-Modal Trail (Trail) is a bicycle and pedestrian commuter trail that will provide an alternative means of transportation for residents of the Midcoast to safely access neighboring communities, town centers, schools and recreational destinations without having to travel on the highway.  The Trail, commonly referred to as the Parallel Trail, was conceptualized in the community developed Highway 1 Safety and Mobility Improvement Study, Phase 1.  The Trail will be separated from the highway and have minimal interaction with vehicular traffic allowing it to serve residents of all ages and abilities.

Conceptually, the trail will span from Montara south to Miramar where it will connect with the Naomi Patridge Trail in Half Moon Bay.  This will provide for a continuous, regional bicycle and pedestrian commuter trail.  By providing residents the opportunity to walk and bicycle throughout the coastside, congestion on the highway should improve and residents will once again be able to travel throughout the Midcoast.

 

Segment 1

The first segment being implemented is between Mirada Road north to Coronado Street.  Conceptually, the trail will be located in Highway 1’s eastern right-of-way the entire length of the trail.  With this alignment, the Trail would be easily accessed by residents living on the east side of Highway 1, require no highway crossings and act as a Safe Route to School for children at El Granada Elementary School.  The details of the alignment will be finalized through an alternative analysis and environmental review.

Contact

For questions or comments about the Midcoast Multi-Modal Trail, please contact:

Mike Schaller, Senior Planner
mschaller@smcgov.org

 

Project Files

 


More on Coastside East-side Trails on Coastside Buzz

Half Moon Bay’s BPAC Gets Update on the East Parallel Bicycle Pedestrian Trail ~ “The Last Link”: Miramar to Roosevelt

SEPTEMBER 15, 2022

 

San Mateo Supervisors Approve $4M for Construction of the Multimodal Trail Segment 1: Mirada North to Coronado

MARCH 10, 2022

 

CUSD Donates Land Speeding Construction of Multi-Modal Trail For This Summer Making E.G. Elementary Access Safer

FEBRUARY 16, 2021

 

CTC Final Draft Include Midcoast Alignment Completion of California Coastal Trail

JANUARY 25, 2021

 

Hwy 1 West Side Parallel Walking and Biking Trail Grant Application for Construction Phase

JULY 8, 2019

Related

Filed Under: Half Moon Bay City Council, Home Top List, Podcasts, Public Agencies

Subscribe
Login
Notify of
guest
Only 1 hyperlink per comment allowed. Swear words will not be published.
guest
0 Comments
Inline Feedbacks
View all comments

Follow Us!

CoastsideBuzz Instagram Icon Link Coastsidebuzz Facebook Icon Link

SUBSCRIBE TO WEEKLY BUZZMAIL


Civic Bell
LPG Logo
Half Moon Bay Coastside Tours Logo thumbnail
KHMB Coastside Radio logo
Half Moon Bay Chamber of Commerce Logo
Pacifica Chamber
surf-shop mavericks
hmb review Oceano Hotel and Spa
hmb brew co logo

Coastside Buzz

About
Contact

Work With Us

Promotion
Buzz Productions

CoastsideBuzz Newsletter

Join Us on Facebook

Join Us on Facebook

Search

© Copyright 2023 · CoastsideBuzz.com · Half Moon Bay, California · All Rights Reserved

wpDiscuz
 

Loading Comments...